Web Application RFP Template in 2025: Questions, Acceptance Criteria, and Red Flags

aTeam Soft Solutions October 31, 2025
Share

An effective Request for Proposal (RFP) is the basis of a successful web application development. 1 Getting the Right Web Development Agency In 2025, as the average web development agency responds to 150-175 RFPs each year, writing a clear, thorough, and strategic RFP has become more than just best practice—it’s your competitive advantage for attracting the right vendor and ensuring your projects start on the right foot.

This all-encompassing guide features full RFP templates, critical questions, an acceptance criteria framework, red flag identification, and scoring models, empowering CTOs, PMs, and business owners with the knowledge to confidently select a vendor.

Why a Structured RFP is Important in 2025.

Transparency drives down costs: RFPs with more detail reduce the scope of changes to the project and the cost overruns by 30 percent, compared to informal vendor selection methods.

Good quality vendor response: Well-written RFPs will tend to attract the best quality vendors who respect the professionalism of the RFP issuer and want to do business with them, demotivating (perhaps implicitly) those looking for ambiguity to hide incompetence.

Objective scoring: An established matrix can level the playing field by eliminating subjective judgment, allowing people to vote with data and not their opinions, thus minimizing prejudices among voters and helping achieve better choices.

Legal protection: A Full Moon RFP establishes a contractual basis for the scope, deliverables, timelines, and acceptance criteria, and that provides protection for both sides.

Stakeholder alignment: The RFP procedure ensures internal consensus on objectives, priorities, and constraints before vendor talks, avoiding midstream flippage.

FULL RFP Section Checklist

A well-rounded web application RFP will include the following 12 essential topics:

1. Summary for the Executive (0.5 pages)

Purpose: Provide a high-level overview that allows vendors to quickly assess fit.

Contents:

  • Project name and type (e.g., “Customer Portal Rebuild”)
  • Primary business goal (e.g., “Reduce support tickets 40% via self-service”)
  • Budget range (e.g., “$75K-$120K”)
  • Timeline (e.g., “Go-live by Q2 2026”)
  • Technology preference if any (e.g., “React + Node.js  preferred”)

Example:


“ABC‌‍‍‌‌‍‍‌ Corp is looking for a web development partnership to create a customer self-service portal that will decrease the support ticket volume by 40% and at the same time raise NPS scores. Cost: $75K-$120K. Time: 6 months of development, Q2 2026 release. We are choosing the technology stack React/Node.js with AWS ‌‍‍‌‌‍‍‌hosting.” 

2. Company Profile (1-2 pages)

Purpose: Help vendors understand your business context, culture, and users.

Contents:

  • Company mission and history
  • Products/services offered
  • Target customers and market position
  • Industry sector and regulatory environment
  • Current tech stack and digital maturity
  • Team size and structure

Why it matters: Vendors customize proposals according to industry experience—a fintech company receives different advice than an e-commerce retailer.

Tip: Be straightforward, concise, and to the point about the project in this section. Vendors scan dozens of RFPs; honor their attention by not including your company history.

3. Project Summary (1-2 pages)

Purpose: Explain why this project exists and what problem it solves.

Contents:

  • Current situation and pain points
  • Why existing solution is inadequate
  • Business drivers and urgency
  • Strategic importance to organization
  • Success definition at high level

Example:


“Our existing customer portal (built in 2018, PHP/MySQL) has a 45% cart abandonment rate, 4-second load times, and doesn’t work on mobile. Support tickets cost $35 each; 60% are “How do I…?” queries that could be answered with better UX. This rebuild is expected to reduce support costs by half ($420K annually) while lifting customer satisfaction by 25 points (current NPS: 42).”

Pitfall to avoid: Don’t just say, “We want an amazing website.” Be explicit about the problems, context, and desired outcomes.

4. Project Goals and Objectives (1-2 pages)

Purpose: Define measurable success criteria and business outcomes.

Contents:

  • Primary business goal (one clear objective)
  • Secondary goals (2-3 supporting objectives)
  • Quantifiable success metrics with current baselines
  • Target audience and user personas
  • Competitive positioning and differentiation

Example:


Main Objective: Boost online product sales by 25% ($2.5M to $3.1M per year) through development of a friendly/easy e-commerce environment.

Success Metrics:

  • Cart abandonment: Reduce from 45% to <30%
  • Average order value: Increase from $87 to $105
  • Mobile conversion: Match desktop (currently 40% lower)
  • Page load time: <2 seconds for 95th percentile
  • Net Promoter Score: Improve from 42 to 65+

Target Audience: Small business owners, 30-55 years old, those who bought a B2B software subscription, 65% mobile traffic.

Tip: Batter your objectives in business, not IT terms. “Reduce support costs by $200K per year” wins over “Implement chatbot with NLP.

5. Statement of Work (2-3 pages)

Purpose: Define precisely what is included, excluded, and optional.

Contents:

  • In Scope: Core features and deliverables vendors must provide
  • Out of Scope: What vendors should NOT quote (prevents scope creep)
  • Nice to Have: Optional features vendors can propose

Structure:

In Scope:

  • User authentication (email/password, social login)
  • Product catalog (500 SKUs) with search/filter
  • Shopping cart and checkout (Stripe integration)
  • Order history and tracking
  • Admin dashboard for inventory management
  • Responsive design (mobile, tablet, desktop)
  • Initial content migration (250 products)
  • User acceptance testing support

Out of Scope:

  • Content writing or photography
  • ERP/CRM integrations
  • Multi-language support
  • Marketing automation setup
  • Post-launch advertising

Nice to Have (quote separately):

  • Live chat widget
  • Product recommendation engine
  • Subscription/recurring billing
  • Customer reviews and ratings

Why you should care: 70% of projects suffer from scope creep—having clear boundaries guards against argument and ballooning costs.

6. Functional Specifications (3-5 pages)

Purpose: Detail user-facing features and workflows.

Contents:

  • User roles and permissions
  • Core user journeys and workflows
  • Forms, inputs, and data validation
  • Integrations with third-party services
  • Reporting and analytics needs
  • Content management requirements

Best Practice: Use user stories with acceptance criteria.

User Story: “As a returning customer, I want to see my order history so I can monitor shipments and reorder items.”

Acceptance Criteria (Given/When/Then format):

  • Given I’m a logged-in customer
  • When I navigate to “My Orders” page
  • Then I see list of past orders with Order #, Date, Status, Total, Tracking Link
  • And I can filter by date range (Last 30/90/365 days)
  • And I can search by product name or order number
  • And I can click “Reorder” to add items to the cart.
  • And the page loads in <2 seconds with 100+ orders

Tip: Be specific with numbers, cutoffs, and behaviors. “Fast page load” is subjective; “<2 seconds for 95th percentile” is verifiable.

7. Technical Requirements (2 to 4 pages)

Purpose: Define technology, architecture, and non-functional requirements.

Contents:

  • Platform & Tech Stack: Preferred frameworks (React, Vue, Angular), backend (Node.js, Python, PHP), database (PostgreSQL, MySQL, MongoDB)
  • Hosting & Infrastructure: AWS, Azure, Google Cloud; scalability requirements
  • Security: Authentication methods, data encryption, compliance (GDPR, HIPAA, PCI DSS)
  • Performance: Load time targets, concurrent user capacity, uptime requirements
  • Browser/Device Compatibility: Supported browsers, mobile responsiveness standards
  • Integrations: APIs, third-party tools, existing systems
  • Accessibility: WCAG 2.1 AA compliance for public-facing applications

Example:


“Tech Stack: We like React (frontend) + Node.js (backend) + PostgreSQL (database) on AWS. Suggestions with justifications are welcome.

Performance: <2s page load (95th percentile), 1,000 concurrent users, 99.9% uptime.

Security: AES-256 encryption at rest, TLS 1.3 en route, OAuth 2.0 authentication, MFA for admin, and penetration testing on a quarterly basis.

Compliance: GDPR compliant (EU customers), PCI DSS Level 1 (for credit card processing).

Browsers: Chrome, Safari, Firefox, Edge Firefox, and Edge (latest 2 versions). Mobile-first responsive design.”

Tip: If you don’t know the technology well enough, ask your vendors for a recommended tech stack, with reasons why. The better vendors will discuss the tradeoffs honestly.

8. Terms of Budget and Payment (1 page)

Purpose: Set financial expectations and payment structure.

Contents:

  • Budget range or fixed amount
  • What budget includes (design, dev, testing, training)
  • Payment structure (deposit, milestones, final payment)
  • Additional costs vendors should itemize separately

Why disclose budget: Transparent budgets save time for both parties. Vendors can:

  • Propose solutions within budget
  • Show what’s achievable at budget and what costs extra
  • Self-select out if budget doesn’t align with quality expectations

Example:


“Budget $75k-$120k (design, development, testing, deployment, training). Provide a detailed cost breakdown by phase.

Payment Terms: 20% deposit, 40% at design approval, 30% at UAT completion, 10% at go-live. Milestone payments are linked to acceptance criteria.

Exclusions: The cost of hosting, fees of any third-party APIs, and charges for content updates after launch.”

Mistake to avoid: Don’t use the phrases “reasonably priced” or “best offer.” It’s a waste of everyone’s time and draws the lowest-quality vendors.

9. Timeline and Milestones (1-2 pages)

Purpose: Communicate project urgency and key deadlines.

Contents:

  • Desired project kickoff date
  • Key milestone expectations (discovery, design, development, testing, launch)
  • Hard deadlines (seasonal launches, trade shows, fiscal year-end)
  • Internal dependencies (approvals, content readiness, stakeholder availability)

Example:


“Project Emission: 15 January 2026

Design Sign Off: 28 February 2026

Development Finish: 15 May 2026

UAT Phase: 16 May to 15 June 2026

Go-Live: June 20, 2026 (hard stop—fiscal year-end)

Note: Release on June 20 is mandatory due to business reporting needs. Those submissions that provided feasible schedules for the work to be completed on time were scored higher.”

Tip: Plan for contingencies and flexibility; tight timelines tend to reduce quality and raise risk.

10. Criteria for Evaluation (1 page)

Purpose: Show vendors how proposals will be scored objectively.

Contents:

  • Weighted scoring criteria with percentages
  • What factors matter most
  • Minimum qualifications (mandatory requirements)

Example:
“Proposals scored on a 100-point scale:

  • Technical Expertise (20%): Tech stack
  •  alignment, scalability approach
  • Relevant Experience (15%): Similar projects in B2B SaaS
  • Budget & Cost Transparency (12%): Detailed breakdown, value for money
  • Team Qualifications (10%): Senior developers, project manager credentials
  • Project Management (10%): Agile methodology, communication frequency
  • Proposal Quality (10%): Understanding of requirements, customization
  • Client References (10%): Verifiable past clients with positive feedback
  • Timeline Feasibility (8%): Realistic schedule with buffer
  • Post-Launch Support (3%): SLA, maintenance offerings
  • Communication (2%): Responsiveness during RFP process

Minimum Qualifications:

  • 3+ completed projects in B2B SaaS or e-commerce
  • Demonstrated React + Node.js expertise
  • Verifiable client references with contact details
  • Portfolio with live URLs showcasing similar work”

This transparency in scoring avoids conflicts and enables vendors to self-assess fit before spending time on proposals.

11. Instructions for Proposal Submission (1 page)

Purpose: Standardize format for easy comparison.

Contents:

  • Submission deadline and timezone
  • Preferred format (PDF, Google Doc, presentation)
  • Page limit or length guidance
  • Required sections and attachments
  • Submission method (email, portal, hard copy)
  • Late submission policy

Example:


“Deadline: 1 Mārch 2026 17:00 EST (late submissions will not be accepted)

Format: PDF, up to 25 pages (appendices not included)

Proposed Sections: Executive summary, team bios, technical approach, timeline, cost breakdown, 3 client references

Attachments: Your portfolio examples (3 projects with URLs), company certifications

Submission: Please submit by email to [email protected] with subject “RFP Response – Customer Portal”

Contact: Jane Doe, CTO, [email protected] for inquiries by Feb 15″

Tip: Establish a clear Q&A window and provide responses to all vendors to stay fair and avoid information asymmetry.

12. Vendor Questions (2-3 pages)

Purpose: Gather specific information for evaluation.

Essential questions by category:

Company & Experience:

  1. How many projects similar to ours (B2B SaaS e-commerce) have you completed in the last 2 years?
  2. Can you provide 3 client references with contact details for projects of similar scope and budget?
  3. What is your team size and structure? How many developers would be assigned to our project?
  4. What percentage of projects are completed on time and on budget? What’s your process when delays occur?

Technical Capability:
5. What tech stack do you recommend for our requirements, and why? What are trade-offs?
6. How do you ensure security, scalability, and performance meet our specified targets?
7. Do you have experience with our required integrations (Stripe, Salesforce API, SendGrid)?
8. How do you handle responsive design and cross-browser compatibility testing?

Project Management:
9. What is your project management methodology (Agile, Scrum, Waterfall, or hybrid)?
10. How often will you provide status updates? What format (standup, weekly report, sprint review)?
11. What tools do you use for project tracking (Jira, Asana, Monday) and collaboration (Slack, Teams)?
12. How do you handle scope changes or additional feature requests mid-project?

Quality Assurance:
13. What is your testing approach (unit, integration, system, UAT)? Who performs testing?
14. What is your typical bug density (defects per 1000 lines of code) and code coverage percentage?
15. Do you provide automated testing? Continuous integration/deployment pipelines?
16. How do you conduct user acceptance testing? What’s your bug-fixing SLA?

Budget & Timeline:
17. Provide a detailed cost breakdown by phase (discovery, design, development, testing, deployment).
18. What is included in your price? What costs extra (hosting, third-party fees, training)?
19. Based on our requirements, what is a realistic timeline with appropriate buffers?
20. What is your payment structure? Do you accept milestone-based payments?

Post-Launch Support:
21. What post-launch support and maintenance do you offer? What’s included vs. paid separately?
22. What are your SLAs for critical bug response time and resolution time?
23. How do you handle ongoing feature development and enhancements after launch?
24. Do you provide training for our team? Documentation and handover process?

Tip: Limit to 10-15 key questions; save detailed technical queries for shortlisted vendor interviews.

Acceptance Criteria Framework

Acceptance criteria specify when deliverables are considered complete and satisfactory. In the absence of clear criteria, disagreement, rework, and payment issues develop.

Categories of Acceptance Criteria

1. Functional Criteria (what the system does):

  • “User can create account with email/password in <30 seconds.”
  • “Admin can export monthly sales report in PDF, CSV, Excel formats.”
  • “Customer receives order confirmation email within 2 minutes of purchase.”

2. Performance Criteria (how fast/reliable it is):

  • “Page load time <2 seconds for 95th percentile users”
  • “System handles 1,000 concurrent users without degradation.”
  • “99.9% uptime (max 8 hours downtime annually)”

3. Security Criteria (how data is protected):

  • “All data encrypted at rest using AES-256”
  • “Multi-factor authentication required for admin access”
  • “Failed login attempts locked after 5 tries for 30 minutes.”

4. Usability Criteria (user experience standards):

  • “All forms accessible via keyboard navigation (WCAG 2.1 AA compliant)”
  • “Error messages clearly explain issue and resolution steps”
  • “Mobile navigation accessible with one hand (thumb zone)”

5. Compatibility Criteria (platforms supported):

  • “Application works on Chrome, Safari, Firefox, Edge (latest 2 versions).”
  • “Responsive design functions on iPhone 12+, Samsung Galaxy S20+, iPad.”
  • “Graceful degradation for IE11 (view-only mode)”

6. Compliance Criteria (regulatory requirements):

  • “GDPR-compliant data collection with explicit consent”
  • “PCI DSS Level 1 compliant payment processing”
  • “WCAG 2.1 AA accessible for government contracts”

Given/When/Then Syntax

The Behavior-Driven Development (BDD) format is most popular for acceptance criteria:

Template:

  • Given [precondition/context]
  • When [user action/trigger]
  • Then [expected outcome]
  • And [additional outcomes]

Example—User Login:

User Story: “As a registered user, I want to sign in with email/password so I can access my account.”

Acceptance Criteria:

  • Given I’m a logged-out user on the Sign-In page
  • When I enter valid email and password and click “Sign In,”
  • Then the system authenticates me and redirects to the dashboard.
  • And the session remains active for 30 days (remember me checked)
  • And the last login timestamp updated in the profile.

Given I’m a logged-out user on the Sign-In page

  • When I enter invalid password 3 times
  • Then the system displays “Invalid credentials” error message
  • And the account is locked for 30 minutes after 5 failed attempts
  • And the user receives security alert email

Rule-Based Structure

For system-level functionality or design requirements, simple checklists work better:

User Story: “As a mobile user, I want fast page loads so I don’t abandon the site.”

Acceptance Criteria:

  • Page load time <2 seconds on 4G connection
  • Images are lazy-loaded below the fold.
  • CSS/JS minified and concatenated
  • CDN used for static assets
  • Lighthouse performance score >90
  • Core Web Vitals: LCP < 2.5s, FID < 100ms, CLS < 0.1

Tip: Choose a format based on complexity—Given/When/Then for user flows and checklists for technical/design specs.

Red Flags in Vendor Proposals

Early detection of red flags prevents costly errors. Here are 10 critical red flags and what to do about them:

1. Vague or Missing Timeline Estimates (High Risk)

Why worry: Signifies an absence of planning, unrealistic expectations, or hidden motive.

Mitigation: Ask for a detailed Gantt chart/sprint plan including tasks, durations, and dependencies. If the vendor cannot, drop it from consideration.

2. Defined Testing or QA Process (Critical Risk) None

Why worry: Your products will probably have quality problems; you will spend more money fixing bugs after you ship than you would have spent doing QA.

Mitigation: Demand documentation of the QA methodology itself (test types, coverage goals, bug tracking process). No QA process is a dealbreaker.

3. Unwilling to Provide Client References (High Risk)

Why troubling: Implies disgruntled customers or lack of experience. Legitimate vendors are eager to share references.

Mitigation: Cut them out without hesitation. No exceptions—references are standard practice.

4. Extremely Low Pricing (Critical Risk)

Prices 50 percent or more below the market probably mean hidden costs, quality cuts or bait-and-switch schemes.

Mitigation: Investigate further; itemize cost. Know where the pricing is low—offshored junior developers? Skimping on testing? Is there scope missing?

5. Generic Proposal “Cookie Cutter—Not Customized” (Medium Risk)

Why worry: Demonstrates laziness and inattentiveness; very possibly a recycled template that has been used on other clients.

Mitigation: Demand a rewrite that includes site-specific details, extracts from your requirements, and also personalized advice. If the vendor declines, move on.

6. No Talk of Post-Launch Support (High Risk)

Why alarming: Vendors might vanish after the release, resulting in no support for bugs, updates, or inquiries.

Mitigation: Include the need for an SLA/support contract on terms and conditions by response times, bug fix schedules, and ongoing maintenance fees.

7. Team Structure Unclear (High Risk)

Why it’s concerning: Unclear resource allocation; danger of junior, inexperienced employees working on your deal.

Phase out: Request resumes or LinkedIn profiles for your team. Inquire about seniority, roles, and the percentage of your project’s time.

8. No Mention of Security or Compliance (Critical Risk)

When it comes to projects that handle personal data, payments, or other sensitive information—you can’t afford to ignore security.

Mitigation: Require security certifications such as ISO 27001 and SOC 2, along with the penetration testing process and compliance audit procedures. This is non-negotiable.

9. Refuse to use Escrow or Milestone Payments (high risk).

Vendors that insist on 100% payment upfront or refuse to work on milestones have all the leverage; it is difficult to hold them accountable for quality.

Mitigation: Require that payment be made in milestones (e.g., 20/40/30/10 split) and conditioned on meeting acceptance criteria. Good vendors do accept this.

10. Poor Communication During RFP (Medium Risk)

Slow responses, incomprehensible responses, or missed deadlines during the RFP process can predict the communication problem on the project.

Mitigation: Monitor if the pattern continues in the Q&A period. If communication fails to improve, consider elimination—process discipline matters.

Vendor Review Scoring Matrix

Scoring in an objective manner eliminates bias and allows for defensible decision-making. Here’s a 100-point scoring system:

Technical Expertise & Approach (20 points):

  • 20: Perfect tech stack match, innovative approach, scalability proven
  • 15: Strong technical fit, good approach, minor concerns addressed
  • 10: Adequate technical capability, standard approach
  • 5: Technical concerns exist; approach unclear
  • 0: Tech stack mismatch or inadequate expertise

Relevant Experience & Portfolio (15 points):

  • 15: 5+ directly relevant projects with live URLs and references
  • 10: 2-4 similar projects with good outcomes
  • 5: 1 similar project or adjacent experience
  • 0: No relevant experience in industry/complexity

Budget & Cost Transparency (12 points):

  • 12: Detailed phase breakdown, clear value, within budget
  • 8: Budget range provided with reasonable justification
  • 4: Vague pricing or unclear what’s included
  • 0: No budget information or far outside range

Team Qualifications & Structure (10 points):

  • 10: Senior developers, experienced PM, clear role assignments
  • 7: Mid-level team with adequate supervision
  • 4: Mostly junior team or unclear structure
  • 0: Team composition not specified

Project Management Methodology (10 points):

  • 10: Mature Agile process, proven tools, clear communication plan
  • 7: Basic Agile methodology with standard practices
  • 4: Waterfall or ad-hoc approach
  • 0: No defined project management process

Proposal Quality & Understanding (10 points):

  • 10: Excellent customization, deep requirement understanding, thoughtful recommendations
  • 7: Good proposal with project-specific details
  • 4: Generic proposal with minimal customization
  • 0: Poor quality, copy-paste from template

Client References & Reviews (10 points):

  • 10: 3+ enthusiastic references, stellar online reviews (4.8+ stars)
  • 7: 2 solid references, positive reviews (4.5+ stars)
  • 4: 1 reference or mixed reviews
  • 0: No references provided

Timeline Feasibility (8 points):

  • 8: Realistic timeline with appropriate buffer and contingency
  • 6: Tight but achievable timeline
  • 4: Aggressive timeline with risk of delays
  • 0: Timeline missing or completely unrealistic

Post-Launch Support Offering (3 points):

  • 3: Comprehensive SLA with clear response times and ongoing maintenance plan
  • 2: Basic support offering with some clarity
  • 1: Vague support mention
  • 0: No support offering discussed

Communication & Responsiveness (2 points):

  • 2: Excellent responsiveness, clear answers, proactive follow-up during RFP
  • 1: Good communication, timely responses
  • 0: Poor communication, missed deadlines, unclear answers

Scoring Interpretation:

  • 90-100: Exceptional vendor, ideal fit
  • 75-89: Strong candidate, likely finalist
  • 60-74: Adequate vendor, evaluate concerns carefully
  • <60: below threshold, eliminate unless unique circumstances

The Stages of the RFP process

A normal RFP process takes 60 days from writing to contracting:

Weeks 1-2: RFP Drafting (7 days)

  • Define requirements, scope, budget, timeline
  • Align stakeholders on priorities and evaluation criteria
  • Draft complete RFP document

Week 2: Internal Review (3 days)

  • Legal review of contract terms and IP clauses
  • Finance approval of budget parameters
  • Executive signoff on project approach

Weeks 2-3: RFP Release (1 day)

  • Distribute to shortlisted vendors (3-10 typically)
  • Announce via email, RFP platforms (Responsive, RFPio), or public posting

Weeks 3-4: Q&A Period (7 days)

  • Vendors submit clarifying questions
  • Answer publicly or via FAQ shared with all vendors
  • Deadline for final questions before proposal submission

Weeks 4-6: Proposal Preparation (14 days)

  • Vendors draft proposals addressing all RFP requirements
  • Submission deadline (strictly enforced)

Week 7: Proposal Review (7 days)

  • Score proposals using evaluation matrix
  • Check references and online reviews
  • Verify portfolio claims with live URLs

Week 8: Shortlist & Interviews (7 days)

  • Meet top 2-3 vendors for deeper discussion
  • Validate technical capabilities and team fit
  • Clarify proposal questions and concerns

Weeks 8-9: Final Selection (3 days)

  • Choose winning vendor based on combined scores and interviews
  • Notify all participants (winners and losers)
  • Provide feedback to losing vendors (optional but professional)

Weeks 9-10: Contract Negotiation (10 days)

  • Legal review and negotiation of MSA/SOW
  • Scope alignment and acceptance criteria finalization
  • Payment terms and milestone definition
  • IP assignment and confidentiality agreements

Week 11: Project Kickoff (Day 60)

  • Discovery workshop with winning vendor
  • Team introductions and communication setup
  • Tool access and environment configuration
  • Sprint 0 planning

Tips for Timeline Management:

  • Build buffer: Add 20% contingency for delays
  • Set hard deadlines: Be clear which dates are flexible vs fixed
  • Communicate changes: If timeline shifts, notify all vendors immediately
  • Parallel activities: Review early submissions while others finalize

Common RFP Pitfalls to Avoid

1. Unclear Objectives:


Don’t say, “We need a great website.” Be specific: “We want to decrease cart abandonment from 45% to 30% and raise mobile conversion 25% by way of enhanced UX.”

2. Skipping Technical Details:


Ambiguous requirements create unfocused submissions. Specify browser support, performance goals, integrations, and security protocols.

3. Unrealistic Timelines:


“We need this in 6 weeks” is a red flag for a complex application, and it usually means corners will be cut. Quality takes time; deadlines that are too aggressive inevitably compromise it.

4. No Vendor Selection Criteria:


Decisions are left to subjective and political without a scoring system. Assign weights in advance (technical expertise 20%, experience 15%, etc.).

5. Hiding Budget:


“Please provide your best offer” is a waste of time for all concerned. Revealing the budget brings in the right vendors and makes for accurate scoping.

6. Too Many Questions:


The RFP comes with 50+ questions; detailed questions are too much for the vendors. Ten to 15 key questions maximum; detail during finalist interviews.

7. No Q&A Period:


Vendors have questions, and they want clarity. Join us for a Q & A period to ask questions and share responses with all attendees as a demonstration of fairness.

8. Accepting Late Submissions:


It sets a poor precedent, and it is unfair to the vendors who submitted on time. Enforce the deadline strictly unless there are extenuating circumstances.

2025 Best Practices

Use AI for RFP drafting (but with caution):


RFPs can now be initially drafted using tools such as ChatGPT; however, a human review is a must. AI hasn’t gone into your business context, technical constraints, or vendor market.

Request Video Proposals:

A few organizations require a 5 min video summary along with a written submission, showcasing communication talent, team chemistry, and excitement.

Implement Anonymous Scoring:

Have 2-3 reviewers score independently prior to discussion to minimize groupthink and bias.

Add Diversity Questions:

Inquire about the diversity of the team, accessibility knowledge, and inclusive design methodologies if these are important to you.

Prepare for More Than One Round:

With complex work, consider a two-part RFP: initial screen for general fit, then detailed proposals from a shortlist.

Provide Payment for Finalists:

For >$250k projects, think about compensating a small number of vendors (say 3) a fixed fee (like $2–5k) for detailed proposals and presentations—it’s respectful of their time and helps bring senior teams.

The‌‍‍‌‌‍‍‌ 2025 Reality: RFPs Work When Done Right

Properly performed RFPs, according to statistics, decrease the risk of project failure by 40%, reduce the cases of budget overrun by 30%, and improve vendor satisfaction as they result in the establishment of clear expectations. 

The cost—7-14 days in drafting a detailed RFP—delivers better vendor matches, clearer contracts, objective evaluation, and protected scope as dividends. 

For CTOs, product managers, and business owners who are looking to hire web development agencies in 2025, a well-structured RFP is not just a paperwork formality; rather, it is your competitive advantage in securing the right product, the right partner, and the right price. 

Employ this template, modify the questions according to your situation, specify the acceptance criteria clearly, be on the lookout for red flags, and score objectively. I am sure your next web application project is worth this level of ‌‍‍‌‌‍‍‌rigor.

Shyam S October 31, 2025
YOU MAY ALSO LIKE
ATeam Logo
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Privacy Preference